PRICING · VAT EXCLUDED

Quotes are based on your event's conditions

We reflect days, existing CCTV, number of areas and more; the final amount is confirmed after the site survey

Starting priceFrom [To confirm: starting price]Based on 1 day · 4 cameras · VAT excluded
StageArea AArea BArea COpsBoardDays · hours123456
Illustration · numbers match the factors below

01 | WHAT DRIVES THE QUOTE

Six quote criteria

  • Days · hours

    Goes up when: Several days, running late into the night

    Goes down when: One day, short hours

  • CCTV at the venue

    Goes up when: We install our own camera kit

    Goes down when: Existing CCTV can be connected

  • Cameras · areas

    Goes up when: Many areas to watch

    Goes down when: Only one or two points

  • Venue size · layout

    Goes up when: Large or spread across sites

    Goes down when: Compact, in one place

  • Power · network

    Goes up when: Power and network must be brought in

    Goes down when: Outlets and network are available

  • Options

    Goes up when: Pre-event simulation · congestion display boards (quoted separately)

↑ Goes up when↓ Goes down when

02 | EXAMPLE SETUPS

Example setups by event size

These are examples. The final quote is confirmed after the site survey.

One contract covers it all

  • Site survey
  • Installation · removal
  • On-site operations during the event
  • 15 · 30-minute congestion forecasts
  • Final report

03 | REQUEST A QUOTE BY CONDITIONS

Choose your conditions to request a quote

Your choices are filled into the inquiry form. We share the amount after the site survey.

Days
CCTV at the venue
Areas to watch
Request a quote with these conditions ›

For procurement officers

We provide the documents you need for budgeting and approval

  • A reference quote for budgeting
  • Contract documents such as quotes and final reports
  • Contracts through an event agency are also possible

Paid in two installments — deposit [To confirm: payment split] · balance [To confirm: payment split]

Request a reference quote for budgeting ›